Ready-mix concrete

Every mix is batched to NEN-EN 206 at our Dordrecht plant and the ticket shows the grade, slump and cement content you asked for. Choose a grade from the table, or tell us the job and we will.

How much do you need?

Enter the pour in metres. We add 10% for waste and uneven ground, then show the loads in 6 m³ and 8 m³ trucks.

Enter the three dimensions to see cubic metres and loads.

Quick reference

Volume per square metre, and how far one 6 m³ load goes.

PourVolumeOne 6 m³ load covers
100 mm (4 in) slab0.10 m³10 m²
150 mm (6 in) slab0.15 m³6.7 m²
200 mm (8 in) slab0.20 m³5 m²
Strip footing 600 × 300 mm0.18 m³ per metre5.5 m
Strip footing 600 × 450 mm0.27 m³ per metre3.7 m
Trench fill 600 × 900 mm0.54 m³ per metre1.85 m

Mix specifications

Designated and designed mixes to NEN-EN 206. If your engineer has specified something not listed, send the specification and we batch to it.

Ready-mix grades
ClassTypical useExposureConsistencyMax aggregate
C20/25Floors, footings, shed and machine basesX0 / XC1S2 (50–90 mm)20 mm
C25/30Reinforced slabs, garage floors, pathsXC2S2–S320 mm
C28/35Reinforced foundations, retaining wallsXC3 / XC4S3 (100–150 mm)20 mm
C30/37Structural slabs, external paving, yardsXC4 / XF1S320 mm
C35/45Suspended slabs, columns, exposed structuresXC4 / XF3S320 mm
C40/50Heavy-duty industrial floors, precastXD1 / XF4S2–S320 mm
Foam concrete / flowing screedVoid fill, trench reinstatement, floor screedX0Flowing6 mm or none

Admixtures and options

Retarder
Slows setting for long pours or hot days. Ask for it on anything over 40 m³.
Accelerator
Faster strength gain in cold weather or when the next trade is waiting.
Waterproofing
Integral admixture for basements, tanks and retaining walls.
Fibres
Polypropylene or steel fibres in place of mesh for slabs and yards.
Air entrainment
Frost and de-icing salt resistance for external paving and polder roads.
Colour
Pigmented mixes in buff, red and charcoal, colour-matched to a sample.

Ready to order?

Tell us the grade, the volume and the postal code. Orders in by 3pm are delivered next working day.

Order concrete